LOU Pathways Meeting Summary Phase 1 - Final Components as submitted for bids 6/7/2006 Add Bike Lanes on McElroy Dr Pave Railbed from Molly Barr to Jackson Ave Pedestrian Bridge over Jackson Connections through the Depot to Bike lanes on G. Ford Pkwy Bike Lanes on University Place (Bike/Walk lanes added to Old Taylor Bridge @ Hwy 6 to be completed in a separate already-funded project, now in design phase) Bike Lanes on either side of Old Taylor from Hwy 6 to Whirlpool Light 2-way bike path on west side of Old Taylor from Whirlpool light to TVA Right of Way Gravel? Path to Old Railbed Replacement of Washed out Trestle with culverts, grade adjacent Railbed to meet 6% Guidelines Resurface Railbed with packed gravel Phase 1 - Projected Timeline Project Advertised June 7, 2006 Bids Open July 12, 2006 Project Awarded, Bonds issued Work Begins on or around Aug 1, 2006 120 Working Days, Asphalt work limited by cold weather Project Completed on or around Feb 1, 2007 Phase 2 priorities - under consideration for inclusion in ~$750,000 proposal for MDOT Transportation Enhancement Funds 1. Completion the Core loop, that is: From the end of the bike lanes at N. Lamar and Molly Barr, 2 options a. Bike lanes on each side of N. Lamar to Douglas Signs on Douglas and Williams to Avent Park b. Bike lanes on Molly Barr from N. Lamar to Park Drive Signs on Park Drive to Ridgewood Manor Dr. Signs on Ridgewood Manor Dr. to Sisk Ave From Bramlett Blvd and Sisk south on Bramlett across University Ave to S. 18th S. 18th to short jog on Garfield continue S. 18th under Hwy 6 Left on - Access Rd. across S. Lamar to Frontage Rd to Old Taylor. Complete signage and lanes where appropriate (Signal at S. Lamar?) Map at: http://home.olemiss.edu/~mmossing/gmapPhase1_2.html 2. Bike lanes (or signs) on Sisk Avenue from Bramlett to Conference Ctr. 3. Bike lanes (or signs) on S 18th to Belk Dr and lanes on Belk Dr from Hwy 7 to S. Lamar. 4. Bike lanes South from New Davis Creek Bridge either on College Hill or Country Club Lane. (MDOT will extend lanes from McElroy NW to Toby Tubby Creek Bridge). Discussed Signage to Identify the Pathways network. Decided on Lafayette Oxford University Pathways -- LOUP as the official designation for the network Vivian Neill will take a stab at logo designs Briefly discussed formalizing and seeking broader representation on the Pathways committee - to be addressed at next meeting Tentative Agenda for Next meeting July 12 2006 (2nd wednesday of the month ) Phase 1 - follow up. Contact to plan for connections, bike racks Oxford Park Commission - Activity Center, Tennis, Baseball New Boys and Girls Club Central Elementary School University, bike racks, promotions for Baseball, Football and Ford Center facilities Promotional, Educational Activities Make Maps for distribution Plan Opening Ceremonies / Events Mayor's (slow motion) Triathlon Walk - Bike - Double Decker Bus Promotion at 2007 Double Decker Festivald May 2007 Bike Month/Week Activities Ongoing Maintenance issues Landscaping - Included? Tree Board?, Garden Clubs? Linear Park Amenities, Benches?, Exercise Stations - Park Commission Mowing, weeding, surface repairs Regular Street Sweeping Schedule for Bike lanes Outreach Cycling events 4th of July Summer Solstice - Evening ride Depot - N Lamar - Molly Barr - Ford Parkway Lafayette Oxford University Pathways Summary